What we do

Home renovation and refurbishment in Guildford and Surrey

A good renovation makes a house feel like it was always meant to be this way. The trick is knowing what to keep, and that is a judgement, not a formula.

Renovation & Refurbishment

Bringing a tired house back to life

Renovation covers everything from a single room to stripping a house back and starting again inside. What the jobs have in common is that you are working with what is already there, which means finding out what that actually is before promising anything.

The houses around Guildford, Godalming, Bramley and Albury span several centuries of building practice, and they behave very differently. A solid walled Victorian or older house has to be allowed to breathe. A 1930s semi has different insulation and layout problems. A 1970s estate house has different ones again. Treating them all the same is how renovations go wrong.

We survey properly before quoting, and we are honest about what we cannot see. Where there is genuine uncertainty behind a wall or under a floor, we say so and agree how it will be handled rather than burying it and producing a bill later.

Your options

What we take on

Some clients want one room done properly. Others hand us an empty house. Both are fine, and the process is the same.

01

Whole house renovation

Stripping back to the structure, then rewiring, replumbing, insulating, replastering and refitting throughout. The most disruptive option and the one that gives the best result.

02

Kitchens

From replacing units in the same layout to knocking through and starting again. Usually the room that changes how a house feels the most.

03

Bathrooms and en suites

Full refits including moving services, tanking, tiling and ventilation. Getting the waterproofing right matters far more than the tile choice.

04

Period property work

Repairs and alterations to older buildings using materials that suit them, including lime mortars and breathable finishes where the building needs them.

05

Reconfiguring a layout

Moving walls and doors to make a house work for how people live now, rather than how they lived when it was built.

06

Refurbishment before letting or selling

Targeted work that lifts a property without spending money where it will not come back. We will tell you where that line is.

On site

The order things happen in

Renovation goes wrong when the sequence is wrong. Decorating before the wiring is done, or fitting a kitchen before the plaster has dried, wastes money and creates arguments.

The general order is: strip out, then structural work, then the things that go inside walls and floors, then close everything up, then finishes. It feels slow at the start because most of what is happening disappears behind the plaster.

  • Survey and strip out, so everyone can see what is actually there before decisions are locked in
  • Structural work, damp and timber issues dealt with first, while access is easy
  • First fix electrics, plumbing and heating, plus insulation where walls and floors are open
  • Plastering, then a proper drying period before anything is fitted on top of it
  • Second fix, kitchen and bathroom fitting, joinery and decoration
  • Flooring, snagging and a final walk round together
Refitted shower room with a blue vanity unit, mirrored cabinet and a sliding door shower enclosure

The paperwork

Regulations, and the paperwork that matters later

We handle this side of it for you. It is included, not an extra.

Most internal renovation does not need planning permission, because you are not changing the outside of the building. The exceptions matter though. If the property is listed, listed building consent is needed for internal alterations too, and carrying out that work without consent is a criminal offence rather than just a planning breach. In a conservation area, external changes such as windows, cladding or roof alterations are far more likely to need consent than they would elsewhere.

Building regulations apply to a lot of renovation work even when planning does not. Structural alterations, new drainage, changes to the heating system, replacement windows and virtually all electrical work are covered. Electrical work in a domestic property has to be done and certified appropriately, and you will want that certificate.

Keep every certificate. When you sell, the buyer's solicitor asks for building control completion certificates, electrical certificates and gas safety records. Work carried out without them can hold up a sale or knock money off the price, and it is a common reason renovations done cheaply cost more in the end.

Detail

Working on older houses

Older solid walled buildings without a damp proof course were designed to manage moisture by letting it evaporate through the wall. Modern materials are designed to keep moisture out. Putting the second onto the first traps water in the structure, and the damage shows up as damp inside, decayed plaster, and eventually rot in embedded timbers.

That is why we use lime mortars and breathable finishes where a building needs them, rather than defaulting to cement and plastic paint because they are quicker. It is a slower and slightly more expensive way to work, and on the right building it is the only way that lasts.

  • Lime mortar and breathable plasters and paints on solid walled buildings
  • Checking the obvious causes of damp first, such as ground levels, gutters and bridged walls, before anything more drastic
  • Insulating older houses in the right order, draughts and roof before walls
  • Repairing original joinery and features where they can be saved rather than replacing them by default
See finished projects
Gable end of a brick extension with a rendered gable and a leaded window, photographed at dusk

How it works

Simple, start to finish

Most of the stress in building work comes from not knowing what happens next. Pick a stage below and see exactly what happens, what we need from you, and how long it takes.

Hover or tap a stage

Single storey extension with black Crittall style glazing, cream render over a brick plinth, and stone steps up to a raised terrace

First visit

We walk round the property with you, take a proper look at what you have got, and talk through what you want to do. If something will not work, or there is a cheaper way to get most of what you are after, this is when we say so. We measure up and take photographs so we can price the job accurately.

What we need from you
Nothing to prepare. Show us round and tell us what you have in mind, even if it is only a rough idea.
How long it takes
About an hour, usually within a week of you calling.

Good to know

Renovation & Refurbishment: your questions

If the answer you need is not here, call us. We would rather spend ten minutes on the phone than have you guess.

For a whole house renovation, usually yes, at least for the main phase. It is faster, cheaper and far less stressful when the house is empty. For a single kitchen or bathroom most people stay, and we plan the work so you are not without the essentials for longer than necessary.

We survey as thoroughly as we can first, but on an older house there is always something behind a wall nobody could see. We agree at the start how those are dealt with, we tell you as soon as we find something, and we price it before doing the work. What we do not do is carry on and present it as a surprise at the end.

Yes, and it usually produces a better result. We are used to working to someone else's specification and drawings. The important thing is that we are all talking early, so the design allows for the services and structure rather than fighting them.

Possibly, but far less often than people are told. The usual real causes are raised external ground levels, a path bridging the wall, leaking gutters, or cement render trapping moisture. Those are cheaper to fix and fixing them actually works. We look at the whole building before recommending anything.

Renovation is usually cheaper per square metre because you are not building new structure, but it depends entirely on the condition of what is there. A house needing rewiring, replumbing and a new roof can cost more than an extension. We will give you both figures if it helps you decide.

For a typical family house, several months, and often longer if there is structural work or the property is listed. We give you a programme at the start and keep you updated as it goes.

Get a price

Tell us about your renovation & refurbishment

Send us a rough idea of what you want to do and we will come out, look at the property and give you a written quote. Free, and with no obligation.

Or call 07584 678280

No obligation. We never pass your details on.

Garden terrace at dusk, with a long timber table under wisteria and festoon lights

Thinking about a project?

Tell us roughly what you have in mind and we will come and look at it. Free quotes across Guildford and Surrey, with no obligation and no sales visit.

CallGet a quote